184. The authorization holder must regularly inspect joints and structural elements of every equipment used to control the pressure to ensure the safe operation of the equipment.
The holder keeps and maintains a register of those inspections until the end of the work for the permanent closure of the well.
1252-2018O.C. 1252-2018, s. 184.